How To Link A Revit Model From BIM 360 (2024)

(Many of the links in this article redirect to a specific reviewed product. Your purchase of these products through affiliate links helps to generate commission for Storables.com, at no extra cost. Learn more)

Introduction

Welcome to the world of Building Information Modeling (BIM) and the wonders it brings to the field of construction! In this digital age, BIM has revolutionized the way we design, construct, and manage buildings. At the forefront of this revolution are two powerful tools: BIM 360 and Revit.

BIM 360 is a cloud-based construction management software that provides a collaborative platform for all stakeholders involved in a project. It allows teams to access and share project information in real-time, ensuring seamless communication and enhanced productivity.

Revit, on the other hand, is a building design and documentation software that enables architects, engineers, and construction professionals to create 3D models and generate detailed construction documentation. It is known for its parametric modeling capabilities, making it a go-to solution for architects and designers.

In this article, we will focus on the process of linking a Revit model from BIM 360. Linking a Revit model allows project teams to reference and coordinate different models within BIM 360, creating a unified view of the project.

Whether you’re an architect, engineer, or contractor, understanding how to link a Revit model from BIM 360 is vital for effective collaboration and project management. So, let’s dive in and explore the steps involved in linking these two powerful tools.

Key Takeaways:

  • Efficient Collaboration
    Linking Revit models from BIM 360 enables seamless collaboration and coordination among project teams. By following best practices and optimizing model performance, construction projects can achieve improved efficiency and accuracy.
  • Real-time Updates
    Regularly updating and syncing linked models within BIM 360 ensures that all stakeholders work with the latest information. Leveraging BIM 360’s mark-up and comment features facilitates effective communication and resolution of design or coordination issues.

Read more: How To Consume A Revit Model In BIM 360

Overview of BIM 360 and Revit

Before we delve into the intricacies of linking a Revit model from BIM 360, let’s take a moment to understand the key features and functionalities of these two tools.

BIM 360:

BIM 360 is a comprehensive construction management software offered by Autodesk. It serves as a centralized hub for all project information, facilitating collaboration and streamlining workflows. BIM 360 offers various modules, including Document Management, Design Collaboration, Field Management, and Model Coordination, among others.

With BIM 360, stakeholders can access project information from anywhere at any time, ensuring that everyone is working on the latest version of the documents. It allows for seamless communication and coordination between different project teams, enabling faster decision-making and reducing rework.

Revit:

Revit is a building design and documentation software that allows architects, engineers, and construction professionals to create 3D models and generate detailed construction drawings. It is widely used in the industry due to its parametric modeling capabilities, which enable design changes to be automatically updated throughout the model.

Revit offers a range of tools and features to aid in the design and construction process. These include intelligent building components, advanced visualization options, and the ability to generate accurate quantity takeoffs and schedules. Furthermore, Revit allows for the creation of custom families, enabling users to design and specify unique building elements.

When used in conjunction with BIM 360, Revit becomes even more powerful. The integration between the two tools enables seamless collaboration and information sharing, making it easier for project teams to work together and ensure project success.

Now that we have a good understanding of BIM 360 and Revit, let’s move on to the next step: preparing the Revit model for linking.

Preparing the Revit model for linking

Before you can link a Revit model from BIM 360, it’s crucial to ensure that the Revit model is properly prepared. This involves a few essential steps to make the linking process seamless and efficient.

Read more: How To Upload A Revit Model To BIM 360

1. Review the Revit model:

Start by reviewing your Revit model and ensuring that it is complete and accurate. Check for any issues such as missing elements, incorrect dimensions, or overlapping objects. It’s essential to resolve any modeling issues before linking the model to BIM 360 to avoid compatibility issues or data discrepancies.

2. Coordinate with project teams:

Collaboration is the essence of BIM, so it’s essential to coordinate with other project teams involved in the project. Communicate with architects, engineers, and contractors to ensure that everyone is on the same page and understands the scope and requirements of the project. This coordination will help in aligning the Revit model with other linked models and ensure seamless integration.

3. Establish a project naming convention:

Having a consistent naming convention for your Revit model files is vital, especially when collaborating with other project teams on BIM 360. Establish a clear and logical naming convention that everyone can follow. This will help in easily identifying and locating the correct Revit models within the BIM 360 platform.

4. Clean up the Revit model:

Take the time to clean up your Revit model to remove any unnecessary elements or layers. This includes deleting unused views, removing unused families or components, and organizing the model hierarchy. Cleaning up the model will not only optimize the performance but also make it easier to navigate and work with during the linking process.

Read more: How To Archive A Revit Model In BIM 360

5. Set up project coordinates:

Ensure that the project coordinates in your Revit model are correctly established. This is important for accurate coordination and alignment with other linked models in BIM 360. Verify that the base points and survey points are correctly set up in the Revit model.

By following these steps and properly preparing your Revit model, you’ll be well-equipped to proceed with linking it from BIM 360. Next, we’ll discuss how to upload the Revit model to BIM 360.

Uploading the Revit model to BIM 360

Once you have prepared your Revit model, the next step is to upload it to BIM 360, where it will serve as the basis for linking and collaboration. Uploading the Revit model to BIM 360 is a straightforward process that can be done using the BIM 360 web interface or the BIM 360 desktop connector. Here’s how to do it:

1. BIM 360 web interface:

Log in to your BIM 360 account through the web interface. Navigate to the desired project where you want to upload the Revit model.

Once inside the project, click on the “Document Management” module. This will take you to the document library for the project.

Within the document library, find the appropriate folder or create a new one to organize your Revit models. Click on the “Upload” button and select the Revit model file from your local machine.

After selecting the file, click “Open” to start the upload process. Depending on the file size and your internet connection, the upload may take some time. Once the upload is complete, you will see the Revit model in the document library.

2. BIM 360 desktop connector:

If you prefer using the BIM 360 desktop connector, make sure you have it installed on your computer. Open the BIM 360 desktop connector and log in to your BIM 360 account.

Once logged in, navigate to the project where you want to upload the Revit model. In the desktop connector, select the “Upload” option and choose the Revit model file from your local machine.

Click “Open” to start the upload process. The desktop connector will handle the transfer of the file to BIM 360. You will receive a notification once the upload is complete.

Once the Revit model is successfully uploaded to BIM 360, it will be available for linking and collaboration with other project teams. Now, let’s move on to creating a new project in BIM 360.

Read more: How To Upgrade A Revit Model On BIM 360

Creating a new project in BIM 360

Before you can link the Revit model from BIM 360, you need to create a new project in BIM 360 where all the project information and files will be managed. Creating a new project in BIM 360 is a straightforward process that involves a few steps. Here’s how to do it:

1. Access BIM 360 hub:

Log in to your BIM 360 account and navigate to the BIM 360 hub, which is the central location for managing all your projects. This is typically the landing page when you log in to BIM 360.

2. Create a new project:

In the BIM 360 hub, look for the “Create New Project” button or a similar option, depending on the version of BIM 360 you are using. Click on this button to begin creating your new project.

3. Enter project details:

A dialog box or form will appear, prompting you to enter the necessary project details. Fill in the project name, location, and any other relevant information. You may also have the option to select a project template if available.

Take your time to provide accurate and detailed project information as this will help in organizing and managing the project in BIM 360 effectively.

Read more: How To Publish A Revit Model To BIM 360

4. Set permissions:

BIM 360 allows you to set permissions and control access to project files and information. Determine the appropriate access level for each team member or stakeholder involved in the project. This ensures that the right people have the necessary permissions to view and modify project data.

5. Create project folder structure:

Next, establish the folder structure for your project. This includes creating folders for different project phases, disciplines, or any other categorization that aligns with your project requirements.

Organizing the project folders in a logical manner helps in easy navigation and file management within BIM 360.

6. Save and create project:

Review all the project information and settings you have entered. Once you are satisfied, click on the “Save” or “Create Project” button to create your new project in BIM 360.

After creating the project, you will be directed to the project dashboard or document management module, where you can begin collaborating, uploading files, and linking your Revit model.

Now that you have created the project in BIM 360, let’s proceed to the next step: linking the Revit model from BIM 360.

Linking the Revit model from BIM 360

Linking the Revit model from BIM 360 allows project teams to reference and coordinate different models within the BIM 360 environment. This ensures that all stakeholders are working with the most up-to-date information and improves collaboration and coordination. Here’s how you can link the Revit model from BIM 360:

Read more: What Is BIM In Revit?

1. Open the Revit model:

Open Revit software on your computer and navigate to the Start page. Click on “New” to create a new project or open an existing project.

If you’re creating a new project, select the appropriate template and set up the necessary project settings. Make sure the project is set to the correct units and coordinate system.

2. Access the “Manage Links” dialog:

Once your project is open, go to the “Manage” tab in the top ribbon. From there, click on the “Manage Links” button to access the “Manage Links” dialog box.

3. Add Link:

In the “Manage Links” dialog, click on the “Add Link” button. This will open the file browser window.

Navigate to the folder in BIM 360 where the Revit model is located. Select the desired Revit model file and click “Open” to begin the linking process.

4. Set Link Options:

Once the Revit model is selected, the “Link Revit” dialog box will appear. In this dialog, you can specify various options for the linked model.

You can choose to link the entire model or select specific views or levels to be linked. You can also set options for positioning, visibility, and coordination with other models.

Read more: What Is BIM 360?

5. Confirm the link:

Review the link settings in the “Link Revit” dialog and click “OK” to confirm the link. Revit will now establish a connection with the Revit model in BIM 360 and load the linked model into your project.

6. Manage linked models:

Once the Revit model is linked, you can utilize the various tools and functionalities in Revit to work with the linked model. These include adjusting visibility settings, coordinating with other linked models, and navigating through the model.

Any changes made to the linked model in BIM 360 will be reflected in the linked model within your Revit project.

By following these steps, you can successfully link a Revit model from BIM 360 and leverage the benefits of collaborative BIM workflows. Now, let’s move on to managing linked models in BIM 360.

Managing Linked Models in BIM 360

Once you have linked a Revit model from BIM 360 to your project, it’s essential to manage and optimize the linked models for efficient collaboration and coordination. Here are some key aspects and best practices for managing linked models in BIM 360:

1. Organize models in folders:

In the BIM 360 Document Management module, create folders to organize your linked models. This helps to keep a clear structure and makes it easier for team members to locate and access relevant models.

You can create folders based on different project phases, disciplines, or any other categorization that suits your project needs. Consistency in folder structure across the entire project is crucial for seamless collaboration.

Read more: How To Create A New Project In BIM 360

2. Update and track changes:

As the project progresses, it’s important to keep the linked models up to date with the latest changes made by team members. Regularly check for updates in BIM 360 and ensure that any changes made to the model are synced with the linked model in your Revit project.

Use version control in BIM 360 to track revisions and maintain a clear history of model updates. This allows all stakeholders to stay informed and ensures everyone is working with the most recent version of the linked model.

3. Communicate and coordinate:

Effective communication and coordination among team members are essential when working with linked models in BIM 360. Ensure that team members are aware of the linked models and understand their role in the coordination process.

Use the mark-up and commenting features in BIM 360 to communicate design or coordination issues, making it easier to collaborate across different disciplines and resolve conflicts.

4. Manage model visibility:

When multiple linked models are present in your Revit project, it’s crucial to manage the visibility of each model to avoid clutter and confusion. Utilize Revit’s visibility settings to control the display of linked models based on the current project phase or specific requirements.

Adjusting the visibility of linked models allows you to focus on specific elements or disciplines, enhancing the clarity of the model and improving the coordination process.

5. Regular model coordination:

Engaging in regular model coordination sessions is a critical aspect of managing linked models in BIM 360. Coordinate with other project teams to identify clashes, resolve conflicts, and ensure that all models are aligned and coordinated.

Utilize the clash detection features in BIM 360 to identify clashes between linked models and resolve them collaboratively, saving time and reducing errors during the construction phase.

Read more: How Much Does BIM 360 Cost?

6. Maintain model performance:

Linked models, especially large ones, can impact the performance of your Revit project. Monitor the performance of your project and optimize the linked models to maintain an efficient workflow.

Consider using optimization techniques such as hiding unnecessary elements, purging unused families, or splitting large models into smaller sections to improve overall performance.

By following these best practices and effectively managing linked models in BIM 360, you can enhance collaboration, coordination, and project success. Now, let’s move on to discussing best practices and tips for linking Revit models in BIM 360.

Updating the Linked Model in BIM 360

As a project progresses, changes and updates are inevitable. In order to ensure accurate and up-to-date information, it is important to know how to update the linked model in BIM 360. Here are the steps to effectively update the linked model:

1. Access BIM 360 Document Management:

Log in to your BIM 360 account and navigate to the project where the linked model is stored. Access the Document Management module, which houses all the project files and documents.

2. Locate the linked model:

Navigate within the project folders to find the specific linked model that needs to be updated. This is typically stored in the designated folder where you initially uploaded it.

Read more: What Does A BIM Modeler Do?

3. Replace the existing linked model:

In the Document Management module, select the linked model file that you want to update and choose the “Replace” option. This will prompt you to upload a new version of the model.

4. Upload the updated model:

Using the file browser, select the updated Revit model from your local machine. Make sure the file is the correct version with the necessary changes and updates incorporated.

5. Confirm the update:

Once the updated model is selected, confirm the update and start the upload process. This will replace the old version with the updated model in BIM 360.

6. Notify project collaborators:

After the model is successfully uploaded and updated in BIM 360, it is important to notify other project collaborators about the changes. This will ensure that everyone is aware of the updated information and can access the latest version of the linked model.

Read more: How To Hang Model Airplanes From The Ceiling

7. Reload the linked model in Revit:

To reflect the changes made in the updated linked model, you need to reload it in your Revit project. Open the Revit project and navigate to the “Manage” tab in the top ribbon. Select the “Reload” option and locate the updated linked model in BIM 360.

Once selected, Revit will reload the updated model, replacing the previous version with the latest changes and updates.

By following these steps, you can easily update the linked model in BIM 360 and ensure that all project stakeholders have access to the most recent version. Keeping the linked model up-to-date promotes accurate coordination, collaboration, and efficiency in your project.

Now, let’s move on to exploring some best practices and tips for linking Revit models in BIM 360.

Best Practices and Tips for Linking Revit Models in BIM 360

Linking Revit models in BIM 360 is a crucial aspect of effective collaboration and coordination in the construction industry. To ensure a smooth and efficient linking process, here are some best practices and tips to keep in mind:

1. Establish a consistent file naming convention:

Adopt a standardized file naming convention for your Revit models and ensure that all project team members follow it. A consistent naming convention helps in identifying and locating the correct linked models within BIM 360, reducing confusion and streamlining access to the correct files.

2. Coordinate with project teams:

Prioritize open and constant communication with other project teams that are linked to your model. Collaborate and coordinate effectively to ensure that all models align correctly and potential clashes or conflicts are resolved in a timely manner.

Read more: How To Import CAD Into Revit

3. Regularly update and sync the linked models:

Regularly check for updates and changes in linked models within BIM 360. Sync the models with your Revit project to ensure you are always working with the latest information. This promotes accurate coordination and minimizes errors that may arise from outdated models.

4. Optimize model performance:

If your linked models are large or complex, take steps to optimize their performance. This can include hiding unnecessary objects, utilizing Revit’s visibility settings to focus on specific elements, or breaking large models into smaller, more manageable sections. Optimized models enhance navigation and collaboration within the BIM 360 environment.

5. Leverage BIM 360’s mark-up and comment features:

Utilize the mark-up and comment features available in BIM 360 to effectively communicate design or coordination issues. This allows team members to collaborate, provide feedback, and resolve conflicts directly within the BIM 360 platform, streamlining the coordination process.

6. Regularly perform clash detection:

Utilize clash detection tools within BIM 360 to identify clashes and conflicts between linked models. This helps in early detection and resolution of coordination issues, reducing rework and potential construction delays.

Read more: How To Export Revit To CAD

7. Maintain consistent coordination meetings:

Schedule regular coordination meetings with project teams to discuss and address any coordination issues that arise. These meetings provide an opportunity to review and resolve clashes, ensure alignment between models, and maintain effective communication among stakeholders.

By following these best practices and implementing these tips, you can optimize the linking process of Revit models in BIM 360. Doing so will result in improved collaboration, coordination, and overall project efficiency.

Conclusion

Linking Revit models from BIM 360 is a vital step in achieving seamless collaboration and coordination in construction projects. By leveraging the power of BIM 360 and Revit, project teams can access real-time information, streamline communication, and enhance overall project efficiency.

In this article, we explored the process of linking a Revit model from BIM 360, starting from the preparation of the Revit model to uploading it to the BIM 360 platform. We discussed the importance of reviewing and coordinating with project teams, establishing a project naming convention, and cleaning up the Revit model before linking it.

We then delved into the steps of uploading the Revit model to BIM 360 and creating a new project in the platform. We explored how to link the Revit model within BIM 360 and manage linked models effectively. Additionally, we highlighted the significance of updating the linked model and provided best practices and tips for successful linking and management.

By following these best practices, project teams can optimize collaboration, coordination, and accuracy in their construction projects. Effective communication, regular model updates, and maintaining an organized folder structure within BIM 360 are key factors in achieving successful project outcomes.

As the construction industry continues to embrace BIM and cloud-based collaboration platforms, such as BIM 360, the linking of Revit models becomes increasingly important. The ability to effortlessly link and update models in real-time improves decision-making, reduces errors, and enhances overall project efficiency.

In conclusion, by understanding and implementing the processes, best practices, and tips outlined in this article, you will be well-equipped to link Revit models from BIM 360 and unlock the full potential of collaborative BIM workflows in the construction industry.

Frequently Asked Questions about How To Link A Revit Model From BIM 360

Can I link a Revit model from BIM 360 to another software?

Yes, you can link a Revit model from BIM 360 to other software such as Navisworks, AutoCAD, and other BIM software that supports the BIM 360 platform.

What are the benefits of linking a Revit model from BIM 360?

Linking a Revit model from BIM 360 allows for real-time collaboration, centralized access to the latest model version, and seamless integration with other BIM 360 features such as document management and project administration.

Is it possible to link multiple Revit models from BIM 360 into one project?

Absolutely! You can link multiple Revit models from BIM 360 into one project, enabling comprehensive coordination and visualization of various building components and disciplines within a single environment.

How does linking a Revit model from BIM 360 enhance project coordination?

By linking a Revit model from BIM 360, project stakeholders can effectively coordinate design changes, clash detection, and constructability reviews, leading to improved project outcomes and reduced rework during construction.

Can I link a Revit model from BIM 360 to facilitate construction sequencing and planning?

Yes, linking a Revit model from BIM 360 enables construction teams to leverage the model for 4D construction sequencing and planning, enhancing project scheduling, logistics, and on-site coordination.

At Storables.com, we guarantee accurate and reliable information. Our content, validated by Expert Board Contributors, is crafted following stringent Editorial Policies. We're committed to providing you with well-researched, expert-backed insights for all your informational needs.

How To Link A Revit Model From BIM 360 (2024)

References

Top Articles
Latest Posts
Article information

Author: Kimberely Baumbach CPA

Last Updated:

Views: 5931

Rating: 4 / 5 (41 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Kimberely Baumbach CPA

Birthday: 1996-01-14

Address: 8381 Boyce Course, Imeldachester, ND 74681

Phone: +3571286597580

Job: Product Banking Analyst

Hobby: Cosplaying, Inline skating, Amateur radio, Baton twirling, Mountaineering, Flying, Archery

Introduction: My name is Kimberely Baumbach CPA, I am a gorgeous, bright, charming, encouraging, zealous, lively, good person who loves writing and wants to share my knowledge and understanding with you.